NOTES:
- Applicable detail for floor slab and elevated slab.
- Concrete slab structure should be sufficient strength to take weight of finished shower base.
- Shower channel trench envelope should be "blocked out" during concrete slab pour to allow the shower channel to be installed separately from the main structural floor slab.
- Pipe stub should be fully accessible to allow transition coupler to be installed prior to finished concrete pour around shower channel baby.
- Refer to hot mop painted membrane manufacturers regarding membrane application and properties.
- Finished shower floor should slope a minimum of 1% (1/8" per 1ft) to the shower channel.